PowerFill Phase 8 Workstream 1 — Completion Report (Superset Dashboards)
Author: PSSaaS Systems Architect
Date: 2026-04-19
Status: Code complete; sentinel phase-8-superset-ready ✓; 233/233 tests pass (32 BestEx + 200 PowerFill + 1 Api + 6 skipped — unchanged from Phase 7 baseline); 8 PowerFill dashboards + 25 charts deployed end-to-end to PSX Superset (bi.staging.powerseller.com) against PS_DemoData; F-7-8 / 688-row Cash Trade Slotting pattern empirically validated through Superset's own engine; pending Collaborator review and PO push. Workstream 2 (React UI) deferred to a follow-up session per Reviewable Chunks (PO-confirmed at planning checkpoint).
Sentinel: phase-8-superset-ready ✓
Companion docs:
- Phase 7 completion report:
powerfill-phase-7-completion(the upstream Phase 8 builds on) - ADR-025 (Phase 7 Report API Pattern):
adr-025-powerfill-report-api-pattern(the freshness-verdict + latest-Complete-wins semantics that Phase 8 dashboards mirror) - PowerFill Dashboards doc (NEW):
powerfill-dashboards(per-dashboard reference) - A63-A64 (Phase 8 W1 new assumptions):
powerfill-assumptions-log §A63-A64 - W2 kickoff prompt:
powerfill-phase-8-workstream-2-kickoff
TL;DR
Phase 8 Workstream 1 (Superset Dashboards) ships:
- 8 SQL queries under
infra/superset/queries/37_*.sqlthrough44_*.sql— 1 hub + 7 detail (mirroring the 7 canonical Phase 7 reports) + the kickouts surface folded into dashboard 2 via UNION ALL. - 1 deploy script
infra/superset/deploy-powerfill.py(354 LOC; idempotent CREATE-or-UPDATE; mirrorsdeploy-loan-pnl.pypattern). - 8 dashboards × 25 charts deployed to PSX Superset against PS_DemoData (dashboard IDs 13-20).
- PowerFill Dashboards reference doc at
docs-site/docs/superset/powerfill-dashboards.md. - Sentinel bumped from
phase-7-reports-readytophase-8-superset-ready(PowerFillModule.cs). - Spec amendment marks Phase 8 partially done (W1).
- 2 new assumption-log entries (A63 — defensive Existing-Disposition query; A64 — single-DB-connection v1).
- 0 changes to backend code, EF entities, SQL deploy scripts, or tests — Phase 8 W1 is read-only over the existing 23-table PowerFill schema + the upstream tables (no new C# / no new T-SQL deploys).
The architectural centerpiece is the F-8-BR-1 / A63 defensive query for Existing Disposition: the Backlog re-read pass at planning time identified that PS_DemoData's encrypted pfillv_existng_pool_disposition view would surface the same SqlException 207 that Phase 7 catches in the API service — but Superset can't catch it. The Phase 8 query bypasses the view entirely and mirrors its logical shape (CTEs cte_epd_0030 through cte_epd_0600) directly against the upstream tables, omitting the note_rate column that the legacy encrypted view also lacks.
The Phase 8 PoC against PS_DemoData demonstrates all 8 dashboards rendering correctly, validated end-to-end through Superset's own engine (not just the deploy script's row-count probe):
| Dashboard | Source row count on PS_DemoData latest run | Expected | ✓ |
|---|---|---|---|
| 1. Run Overview (Hub) | 5 | 5 | ✓ |
| 2. Allocation Guide | 0 | 0 (BR-9 cleared on Failed) | ✓ |
| 3. Trade Recap | 0 | 0 (BR-9 cleared) | ✓ |
| 4. Pool Switching | 0 | 0 (A54-blocked) | ✓ |
| 5. Pool Candidates | 0 | 0 (BR-9 cleared) | ✓ |
| 6. Existing Pool Disposition | 0 | 0 (defensive query — F-8-BR-1/A63) | ✓ |
| 7. Pooling Guide | 0 | 0 (A54-blocked) | ✓ |
| 8. Cash Trade Slotting | 688 | 688 (F-7-8 — survives BR-9 per A58) | ✓ |
The Cash Trade Slotting dashboard returns 688 real rows on the latest Failed run — empirical proof that A58's preservation scope is observable through the Superset surface, not just the Phase 7 read APIs. This matches Phase 7's PoC byte-for-byte and is the canonical proof-of-life for the Phase 8 PO milestone.
Sub-phase calendar time: ~1 Architect-session (consistent with 6a-6e and Phase 7 velocity). Banking the pattern: 2 subagent batches (SQL + deploy script) + Architect-authored dashboard-design doc + spec/log/sentinel edits = ~1 session per major workstream.
What was produced
New files
infra/superset/queries/37_pfill_run_history_overview.sql(67 lines) — Hub query:pfill_run_historywith computedduration_seconds+is_latestflag.infra/superset/queries/38_pfill_allocation_guide.sql(97 lines) — Allocation + Kickouts UNION ALL withrow_typediscriminator; one query feeds 4 charts via Superset filter.infra/superset/queries/39_pfill_trade_recap.sql(84 lines) — Per-trade fulfillment counters (35 columns).infra/superset/queries/40_pfill_switching.sql(53 lines) — Switching pairs frompfill_pool_guidefiltered per BR-3.infra/superset/queries/41_pfill_pool_candidates.sql(59 lines) — All-options surface frompfill_loan2trade_candy_level_01.infra/superset/queries/42_pfill_existing_disposition.sql(171 lines) — Defensive query per F-8-BR-1 / A63 — bypasses the encrypted PS_DemoData view; mirrors002_CreatePowerFillViews.sqlCTEs minusnote_rate.infra/superset/queries/43_pfill_pooling_guide.sql(49 lines) — Per-pool aggregation with all 8 BR-3pool_actioncounts.infra/superset/queries/44_pfill_cash_trade_slotting.sql(57 lines) — F-7-8 canonical:pfill_cash_market_mapwith NULL slot fields (matches Phase 7 service exactly).infra/superset/deploy-powerfill.py(354 lines) — Idempotent Flask + SQLAlchemy deploy script; 8 dashboards × 25 charts; mirrorsdeploy-loan-pnl.pypattern.docs-site/docs/superset/powerfill-dashboards.md(NEW; ~250 lines) — Per-dashboard reference doc with A54/A56/A62 carry-over rendering notes.docs-site/docs/handoffs/powerfill-phase-8-completion.md— this completion report.docs-site/docs/devlog/2026-04-19e-powerfill-phase-8-superset.md— devlog entry.docs-site/docs/agents/powerfill-phase-8-workstream-2-kickoff.md— W2 (React UI) kickoff prompt for the next session.
Modified files
src/backend/PowerSeller.SaaS.Modules.PowerFill/PowerFillModule.cs— sentinel bumped fromphase-7-reports-readytophase-8-superset-ready(one-line change atMapGet("/status", ...)).docs-site/docs/specs/powerfill-engine.md— Phased Implementation table marks Phase 8 W1 done with calendar-time observation + W2 deferral note.docs-site/docs/specs/powerfill-assumptions-log.md— A63 (defensive Existing-Disposition query per F-8-BR-1) + A64 (single-DB-connection v1; multi-tenant Phase 9+) added in canonical house style.docs-site/docs/handoffs/pssaas-session-handoff.md— sentinel bumped; backlog row #22 updated; new entry in numbered list.
Out of scope (deliberately not produced)
- No new SQL deploys to
pfill_*tables — Phase 8 W1 is read-only over the existing 23-table schema; no015_*.sqlor beyond. - No backend code changes beyond the sentinel — no new C# entities, services, endpoints, or tests.
- No React UI — Workstream 2 is deferred to a follow-up session per PO direction.
- No ADR-026 — would have documented the React framework choice; deferred with W2.
- No new GHCR image / K8s deployment / GHA workflow — deferred with W2.
- No A54 fix or A56 PoC — Phase 9 carry-overs (the dashboards correctly render the carry-over state).
- No multi-tenant Superset registration — A64 explicitly defers to Phase 9+.
- No A62 closure — the defensive query per F-8-BR-1 / A63 unblocks Phase 8 W1 without forcing the deploy decision.
Decisions made
| # | Decision | Rationale | Where |
|---|---|---|---|
| D-8-1 | Single new deploy script deploy-powerfill.py (over extending deploy-phase3.py or splitting per-dashboard) | Matches established 1-script-per-domain pattern: deploy-dashboards-flask.py (BestEx + PosRecon), deploy-phase2.py (pipeline), deploy-phase3.py (extended trading), deploy-loan-pnl.py (Loan P&L). PowerFill is its own domain. | Phase 8 plan §3 D-8-1 |
| D-8-2 | Hybrid dashboard structure: 1 hub + 7 detail dashboards (over 1 mega-dashboard with 8 chart sections OR 8 dashboards each with 1 chart) | Aligns with the Phase 7 mental model (run_id URL parameter scoping → per-report endpoints) AND the Desktop App's "one report per screen" mental model the PO has 5+ years of experience with. The hub solves the "what runs exist + which is latest?" entry-point question. | Phase 8 plan §3 D-8-2; powerfill-dashboards |
| D-8-3 | PS_DemoData-only single-DB v1; multi-tenant Superset registration is Phase 9+ work | Matches existing Superset infrastructure reality (all 36 existing queries are PS_DemoData-only). Satisfies PO milestone. Multi-tenant correctly deferred per kickoff §Explicit scope (OUT). | Phase 8 plan §3 D-8-3; A64 |
| D-8-4 | Allocation Guide + Kickouts via single UNION ALL query (over two separate dashboards or two separate queries on one dashboard) | Honors kickoff's explicit "8 SQL queries" count (7 reports + 1 hub); discriminator column lets a single dashboard split the views via Superset filter; saves a 9th query file. | This report; query 38 |
| D-8-5 | Existing Disposition query bypasses the encrypted view per F-8-BR-1 / A63 | PS_DemoData's pfillv_existng_pool_disposition is the legacy WITH ENCRYPTION version that lacks note_rate; Phase 7 service catches the SqlException 207 but Superset cannot. The defensive query mirrors the view's logical shape (CTEs cte_epd_0030 through cte_epd_0600) directly against upstream tables, omitting note_rate. | A63; Phase 8 plan §2 F-8-BR-1 |
| D-8-6 | No outer ORDER BY in any of the 8 SQL files | Caught by Deploy Verification Gate arm c: Subagent 1's first-attempt files had outer ORDER BYs which fail when Superset wraps virtual datasets in subqueries (SQL Server Msg 1033). Removed in-place + each file's "Notes for Superset" section now documents the constraint so a future Architect doesn't re-add them. | This report §Gate findings |
| D-8-7 | No mid-phase Reviewable Chunks checkpoint (mirrors 6c/6d/6e/7's pattern) | A8.1/A8.2/A8.3 alternatives stated upfront in plan §3; once approved, implementation was 2-subagent-batch + author-the-doc; ADR-style decisions are baked in. | Phase 8 plan §7 |
| D-8-8 | Reviewable Chunks split at workstream boundary: ship W1, defer W2 | PO-confirmed at planning checkpoint (kickoff strongly recommended; Phase 7 CR #1 banked the pattern). W1 alone satisfies the PO milestone ("PowerFill reports with drill-down in Superset"); W2 adds operator workflow on top but is not strictly required. | This report; W2 kickoff |
Migrations enumerated
This phase ships 0 new schema migrations. Phase 8 W1 is read-only over:
- The existing 23-table PowerFill schema (last extended by Phase 6e's
012_CreatePfillRunHistoryTable.sql) - Phase 2's existing
pfillv_existng_pool_dispositionview (which Phase 8 W1 INTENTIONALLY does not query — see A63) - The upstream tables (
loan,rmcat_loan,loan_shipped,pscat_pools,pscat_trades_pools_relation,pscat_trade_cash_grid) — read directly via Superset's tenant DB connection
PowerFill-owned table count: 23 (unchanged from Phase 6e/7).
Gate findings
Three-layer Primary-Source Verification Gate (with Backlog re-read pass per Phase 7 CR #1)
| ID | Layer | Finding | Disposition |
|---|---|---|---|
| F-8-1 | Spec-vs-implementation | Verified the 8 Phase 7 endpoint contracts match what Phase 8 SQL queries assume about source-table columns. The PowerFillReportService.cs (shipped Phase 7) is the source-of-truth column reference; entity files (PowerFillPowerFillGuide.cs, etc.) are the secondary cite-check. | (a) Pass — contract is fresh (same calendar day as Phase 7); 8/8 SQL queries cite columns that exist in the entity files. Subagent's column-verification report confirmed zero unverified column names. |
| F-8-2 | NVO-vs-implementation | Verified the legacy column shapes match the deployed schema. infra/sql/init/seed-schema.sql defines the upstream reference columns (lines 108-462); PowerFill 001_*.sql through 012_*.sql define the pfill_* columns. | (a) Pass — Subagent cross-checked all referenced upstream columns against the seed-schema; live SQL execution against PS_DemoData confirmed all 8 queries run cleanly. |
| F-8-BR-1 | Implementation-vs-runtime / Backlog re-read pass (per Phase 7 CR #1) | The Backlog re-read pass at planning time identified Backlog row #24 (PS_DemoData has the encrypted legacy pfillv_existng_pool_disposition; deploy of 002_*.sql deferred). The Existing Disposition Superset SQL would hit the same SqlException 207 (Invalid column name 'note_rate') that Phase 7 catches — but Superset cannot catch it. | (b) Scope-changed — Existing Disposition SQL written defensively: bypass the view entirely; transcribe the view's logical shape (CTEs cte_epd_0030 through cte_epd_0600 from 002_CreatePowerFillViews.sql) directly against upstream tables AND omit the note_rate column. Documented as A63. First empirical demonstration of the Phase 7 CR #1 candidate practice's value — the finding was caught at planning time, before any subagent dispatch, before any PoC. (Phase 7 banked the practice as a candidate; Phase 8 confirms it works.) |
| F-8-3 | Subagent output verification | Subagent 1's first-attempt SQL files included outer ORDER BY clauses on 7 of 8 files. Superset wraps virtual datasets in subqueries; SQL Server rejects ORDER BY in subqueries unless TOP/OFFSET is also specified (Msg 1033). | (a) Corrected in place — caught by Deploy Verification Gate arm c (PS_DemoData live probe with SELECT COUNT(*) FROM (q) q wrapper). Removed all outer ORDER BYs; added explicit "no outer ORDER BY" comment in each file's Notes section to prevent future re-introduction. The lesson exists in AGENTS.md ("Superset wraps virtual dataset SQL in subqueries") — Subagent didn't have it cited explicitly in the prompt; banked for future Superset-related subagent prompts. |
| F-8-4 | Implementation-vs-runtime | The chart-data probe wrapper I wrote (SELECT COUNT(*) FROM (q) q) doesn't work for queries 42 (CTE) because CTEs cannot be inside subqueries directly. | (a) Probe-wrapper bug, not query bug — fixed the probe to handle CTE queries differently (run the query directly + count returned rows). All 8 queries verified cleanly via Superset's own engine in the second probe pass. |
Pattern observation: the Backlog re-read pass IS a load-bearing gate input. F-8-BR-1 demonstrates the Phase 7 CR #1 candidate practice has empirical value — caught a real schema-drift issue at planning time that would have surfaced as a runtime SqlException in the deployed Superset dashboard. Banking for canonical-promotion review at the next process-discipline revision. (See §Counterfactual Retro item 1 for promotion language.)
Alternatives-First Gate
Three structural decisions documented in plan §3 + this report's Decisions table:
- D-8-1 — Superset deploy script structure: chose A (single new
deploy-powerfill.py) over B (extenddeploy-phase3.py) and C (per-dashboard scripts). Rationale: matches established 1-script-per-domain pattern; PowerFill is its own domain. - D-8-2 — Per-report dashboard structure: chose C (Hybrid: 1 hub + 7 detail dashboards) over A (1 mega-dashboard with 8 chart sections) and B (8 separate dashboards). Rationale: aligns with both the Phase 7 mental model AND the Desktop App "one report per screen" mental model.
- D-8-3 — Per-tenant DB connection: chose C (PS_DemoData only for v1; multi-tenant Phase 9+) over A (one connection per tenant) and B (per-tenant Superset workspace via RBAC). Rationale: matches existing 36-query infrastructure reality; satisfies PO milestone; multi-tenant correctly deferred per kickoff §Explicit scope (OUT).
Required Delegation Categories
Delegated:
Subagent 1 — 8 PowerFill Superset SQL queries
Category match: SQL script generation from a documented schema > 5 tables
Rationale: 8 SQL queries against ~10 source tables; clear pattern
(infra/superset/queries/22_pool_fill_status.sql + 01_pos_recon_summary.sql);
source-of-truth column references all in entity files. Subagent succeeded
clean first-attempt on column verification (zero unverified columns); one
caught lint per F-8-3 (outer ORDER BYs — fixed in-place by Architect after
Deploy Verification Gate arm c flagged it).
Subagent 2 — deploy-powerfill.py
Category match: Templated entity scaffolding > 3 entities
Rationale: 25 chart definitions in a single Python dict; pattern is
deploy-loan-pnl.py (170 LOC, 5 dashboards); subagent extends to 8
dashboards / 25 charts. py_compile clean; ReadLints zero issues; first
Superset-pod execution succeeded with 8 dashboards + 25 charts created.
Self-implemented with Deliberate Non-Delegation:
Deliberate Non-Delegation: Templated scaffolding (8 dashboard sections)
Task: docs-site/docs/superset/powerfill-dashboards.md (~250 LOC)
Reason for self-implementation: The dashboard-design doc is the canonical
reference for how Superset surfaces the A54/A56/A62 carry-overs to the PO
(e.g., when the Allocation Guide chart shows "No data; pool_guide step
blocked per A54", the doc tells the PO why). This is architecturally
load-bearing for the Phase 8 PO milestone — it's the docs version of the
Phase 7 ADR-025 Note convention. A subagent without the full A54/A56/A62
context would produce text that's structurally correct but UX-semantically
wrong.
Context that would be lost in handoff: F-7-8 (688 cash_market_map rows on
Failed runs); A58 preservation scope split; A60 latest-Complete-wins;
A62 / F-8-BR-1 view drift defensive-query rationale.
Deliberate Non-Delegation: not a category match
Task: Spec amendment (Phase 8 row in Phased Implementation table); A63 + A64
in assumptions log; Phase 8 completion report; devlog entry; W2 kickoff
prompt; session-handoff update.
Reason: Documentation work — Architect-owned per architect-context.md.
Deliberate Non-Delegation: not a category match
Task: Sentinel bump in PowerFillModule.cs (1 line)
Reason: Trivial; doing in passing during commit prep.
Deliberate Non-Delegation: not a category match
Task: Phase 8 PoC verification (probe each SQL against PS_DemoData;
kubectl deploy to Superset pod; verify dashboards render through
Superset's own engine).
Reason: Need the live runtime check for the completion report; can't be
delegated to a subagent without giving them shell + kubectl + Superset
pod access.
Two delegations + Architect-authored docs. Both subagent batches delivered clean first-attempts; the one F-8-3 lint (outer ORDER BYs) was caught by the Deploy Verification Gate exactly as the gate is designed to catch.
Reviewable Chunks at workstream scope
Workstream-boundary checkpoint EXERCISED at planning time. The kickoff strongly recommended the W1/W2 split; the PO confirmed at planning checkpoint. W1 ships this session; W2 gets a fresh planning cycle informed by what Superset taught.
Intra-session checkpoint OFFERED but not invoked. The plan §7 noted I'd offer a checkpoint after Subagent 1's SQL queries landed before dispatching Subagent 2. Subagent 1's queries landed clean (zero unverified columns; one F-8-3 lint that was a pattern-rule oversight, not a structural issue), so I dispatched Subagent 2 in parallel without interrupting per Phase 7's "skip checkpoint" precedent.
Deploy Verification Gate
| Arm | Description | Evidence |
|---|---|---|
| (a) Sentinel signal | PowerFillModule.cs MapGet("/status") returns phase-8-superset-ready | docker exec pssaas-api curl -s http://localhost:8080/api/powerfill/status → {"module":"PowerFill","status":"phase-8-superset-ready"} ✓ (post-restart). dotnet build clean (0 warnings). dotnet test shows 233 passed / 6 skipped / 0 failed — Phase 7 baseline preserved. |
| (b) Live Superset deploy | All 8 dashboards CREATED in PSX Superset (bi.staging.powerseller.com); dashboard IDs 13-20; 25 charts CREATED; column sync succeeded for every dataset (22 / 35 / 13 / 22 / 14 / 13 / 8 / etc. columns). Verified via kubectl exec -n psx-staging superset-688b57c7bc-8822s -- python3 /tmp/pfill-deploy/deploy-powerfill.py. | See deploy script output in §"PoC verification commands and outputs" below. |
| (b) Live data render | 8/8 dashboards verified by running each dataset's SQL through Superset's own engine; row counts match expectations (5 / 0 / 0 / 0 / 0 / 0 / 0 / 688). The F-7-8 / 688-row Cash Trade Slotting result is the canonical proof-of-life. | See §"Probe outputs" below. |
| (c) DB probe | Each of the 8 SQL queries runs cleanly against PS_DemoData via the local pssaas-db container's sqlcmd; no SqlException; no schema-drift surprises (F-8-BR-1 / A63 defensive query proves out cleanly). | See §"Probe outputs" below. |
Counterfactual Retro
Knowing what I know now, what would I do differently?
-
The Backlog re-read pass IS the load-bearing planning gate input — the candidate practice from Phase 7 CR #1 has its first empirical demonstration. F-8-BR-1 (Backlog row #24 → defensive query for Existing Disposition) was caught at planning time, before any subagent dispatch, before any PoC. Phase 7 banked it as a candidate practice; Phase 8 demonstrates it. Banking for canonical-promotion review: the next
process-discipline.mdrevision should add "Backlog re-read pass at planning time" as a sub-practice of the Three-layer Primary-Source Verification Gate's Implementation-vs-runtime layer, with F-7-7 (caught at PoC, would-have-been-Backlog-discoverable) and F-8-BR-1 (caught at planning, was Backlog-discoverable) as the empirical evidence. Suggested wording: "For phases interpreting prior runtime artifacts, re-read the session-handoff Backlog table at planning time; document each row's Phase-N relevance with explicit 'no relevance' or finding text. F-8-BR-1 is the canonical example." -
Subagent prompts should explicitly cite the AGENTS.md Superset lesson — F-8-3 (outer ORDER BYs) is a documented AGENTS.md lesson ("Superset wraps virtual dataset SQL in subqueries") that wasn't cited in Subagent 1's prompt. Adding a single sentence "all queries MUST have NO outer ORDER BY clause per AGENTS.md" would have prevented the F-8-3 finding entirely. Banking for future Superset-subagent prompts: include a "Constraints" subsection that explicitly cites known AGENTS.md lessons relevant to the subagent's domain. The Existing Disposition view-drift constraint WAS cited explicitly (F-8-BR-1 was prevented in the SQL output); the ORDER BY constraint WASN'T cited explicitly (F-8-3 surfaced in the live PoC). Pattern: cite EVERY known constraint in the prompt; don't assume the subagent knows the AGENTS.md lessons.
-
The probe-wrapper bug for CTEs (F-8-4) was a half-second-of-thinking miss at the gate. I wrote
SELECT COUNT(*) FROM (q) qknowing CTEs exist in query 42 but didn't anticipate the wrapper-incompatibility. Banking for future probe scripts: when writing a generic probe wrapper, branch onquery.TrimStart().StartsWith('WITH', ignoreCase=True)and use a CTE-friendly wrapper for those (run the query directly + count returned rows, OR transform the wrapper to;WITH ...+ final SELECT). Phase 9 parallel-validation harness should bake this in. -
Subagent dispatch + self-implementation balance was right at this scale. 8 SQL queries + 25-chart deploy script = 2 mechanical artifacts delegated cleanly. Dashboard-design doc + spec amendment + 2 assumption-log entries + completion report + devlog + W2 kickoff = ~6 architecturally-load-bearing artifacts self-implemented. Mirrors 6e/7's split. Banking for W2 (React UI): heavy templated component scaffolding will be the heavy delegation candidate; the scaffolding decision + ADR-026 + framework-choice + freshness-verdict UX rendering pattern stays Architect-self.
-
The PO milestone IS achievable from Workstream 1 alone — confirmed empirically. The PO can navigate to
https://bi.staging.powerseller.com/superset/dashboard/13/, see the 5 PowerFill runs in the hub, click into the Cash Trade Slotting dashboard, see 688 real rows, and understand both the run lifecycle AND the F-7-8 preservation pattern. The kickoff's "minimum success" criterion is met. W2 (React UI) adds operator workflow on top but is correctly deferred per PO direction. -
Sub-phase calendar time: ~1 Architect-session. Consistent with 6a-6e and Phase 7 velocity. Banking for W2 estimate: API contract layer is fully stable (no W2 backend work needed); React scaffolding is the heavy lift but heavily subagent-delegable; expect 1-2 sessions for W2 if scoped to the kickoff's "Submit / Status / List / Reports navigation" surface. ADR-026 (framework choice) is the load-bearing Architect decision.
-
The empirical PoC outcome was richer than expected. I anticipated 8 dashboards rendering with 7 empty + 1 populated. Actual: same shape, but the Backlog re-read pass produced a planning-time finding (F-8-BR-1) that didn't exist in Phase 7's session, AND the Deploy Verification Gate arm c caught Subagent 1's outer ORDER BYs (F-8-3) — two findings the gates produced rather than the live PoC surfacing. The gates are doing their job.
-
The pre-push docs-build check (canonical Phase 6e/7/8-W1 lesson) caught an MDX trap. The W2 kickoff prompt initially had
GET /runs/{id}at line 31 OUTSIDE of backticks; MDX's SSG renderer parsed{id}as a JavaScript expression and threwReferenceError: id is not defined. Thedocker build -f docs-site/Dockerfile.prod docs-sitecheck identified the exact failing path (/docs/agents/powerfill-phase-8-workstream-2-kickoff) and the exact error. Fixed in-place by wrapping the four endpoint mentions on L31 in backticks. Banking the canonical confirmation: the pre-push docs-build check is the load-bearing gate against MDX traps; it MUST run before any commit involving newdocs-site/docs/**files. (Phase 6e originated the lesson; Phase 7 + 8-W1 bank empirical proof.) Ghost Deploy prevention working as designed.
PoC verification commands and outputs
Status sentinel (Deploy Verification Gate arm a)
$ docker exec pssaas-api curl -s http://localhost:8080/api/powerfill/status
{"module":"PowerFill","status":"phase-8-superset-ready"}
Build + tests (sentinel bump didn't break Phase 7)
$ docker exec pssaas-api dotnet build /app/PowerSeller.SaaS.sln --nologo
Build succeeded. 0 Warning(s). 0 Error(s).
$ docker exec pssaas-api dotnet test /app/PowerSeller.SaaS.sln --no-build --nologo
Passed! - Failed: 0, Passed: 32, Skipped: 0, Total: 32 - PowerSeller.SaaS.Modules.BestEx.Tests
Passed! - Failed: 0, Passed: 1, Skipped: 0, Total: 1 - PowerSeller.SaaS.Api.Tests
Passed! - Failed: 0, Passed: 200, Skipped: 6, Total: 206 - PowerSeller.SaaS.Modules.PowerFill.Tests
# Grand total: 233 passed, 6 skipped, 0 failed (unchanged from Phase 7 baseline)
DB probe — 8/8 SQL queries against PS_DemoData (Deploy Verification Gate arm c)
(Run via docker exec pssaas-db /opt/mssql-tools18/bin/sqlcmd -S 'hostedps-sql.public.086ea791c2f1.database.windows.net,3342' -U kevin_pssaas_dev -d PS_DemoData ... after stripping comments per read_sql() mirror logic.)
| Query | row_count | Expected |
|---|---|---|
37_pfill_run_history_overview.sql | 5 | 5 ✓ (matches kickoff "5 rows from prior 6e/7 PoCs") |
38_pfill_allocation_guide.sql | 0 | 0 ✓ (BR-9 cleared on Failed) |
39_pfill_trade_recap.sql | 0 | 0 ✓ (BR-9 cleared) |
40_pfill_switching.sql | 0 | 0 ✓ (A54-blocked) |
41_pfill_pool_candidates.sql | 0 | 0 ✓ (BR-9 cleared) |
42_pfill_existing_disposition.sql | 0 | 0 ✓ (defensive query — F-8-BR-1/A63 mitigation works; no SqlException 207) |
43_pfill_pooling_guide.sql | 0 | 0 ✓ (A54-blocked) |
44_pfill_cash_trade_slotting.sql | 688 | 688 ✓ (F-7-8 canonical pattern — survives BR-9 per A58) |
Live deploy (Deploy Verification Gate arm b)
$ kubectl exec -n psx-staging superset-688b57c7bc-8822s -- python3 /tmp/pfill-deploy/deploy-powerfill.py
=== PowerFill Dashboard Deployment ===
--- PSSaaS PowerFill - Run Overview (Hub) ---
Dataset CREATED: PowerFill - Runs Table (id=70)
Columns synced: 14
Chart CREATED: PowerFill - Runs Table (id=33)
Dataset CREATED: PowerFill - Latest Run KPIs (id=71)
Columns synced: 14
Chart CREATED: PowerFill - Latest Run KPIs (id=34)
Dataset CREATED: PowerFill - Status Distribution (id=72)
Columns synced: 14
Chart CREATED: PowerFill - Status Distribution (id=35)
Dashboard CREATED: PSSaaS PowerFill - Run Overview (Hub) (id=13)
--- PSSaaS PowerFill - Allocation Guide ---
[...4 charts CREATED, dataset id=73-74, chart id=36-38, dashboard id=14...]
--- PSSaaS PowerFill - Trade Recap ---
[...3 charts CREATED, dataset id=75-77, chart id=39-41, dashboard id=15...]
--- PSSaaS PowerFill - Pool Switching ---
[...2 charts CREATED, dataset id=78-79, chart id=42-43, dashboard id=16...]
--- PSSaaS PowerFill - Pool Candidates ---
[...3 charts CREATED, dataset id=80-82, chart id=44-46, dashboard id=17...]
--- PSSaaS PowerFill - Existing Pool Disposition ---
[...3 charts CREATED, dataset id=83-85, chart id=47-49, dashboard id=18...]
--- PSSaaS PowerFill - Pooling Guide ---
[...3 charts CREATED, dataset id=86-88, chart id=50-52, dashboard id=19...]
--- PSSaaS PowerFill - Cash Trade Slotting ---
Dataset CREATED: PowerFill Cash Slotting - Map Table (id=89)
Columns synced: 8
Chart CREATED: PowerFill Cash Slotting - Map Table (id=53)
[...3 more charts, dashboard id=20...]
=== PowerFill deployed: 8 dashboards, 25 charts ===
Live data render — verified through Superset's engine (the canonical end-to-end test)
=== Phase 8 PoC verification (via Superset engine) ===
PowerFill - Runs Table ACTUAL= 5 EXPECTED=5
PowerFill Guide - Allocations Table ACTUAL= 0 EXPECTED=0 (BR-9 cleared on Failed)
PowerFill Recap - Trade Table ACTUAL= 0 EXPECTED=0 (BR-9 cleared)
PowerFill Switching - Pairs Table ACTUAL= 0 EXPECTED=0 (A54-blocked)
PowerFill Candidates - Top 100 by Score ACTUAL= 0 EXPECTED=0 (BR-9 cleared)
PowerFill Existing Disposition - Detail Table ACTUAL= 0 EXPECTED=0 (defensive query — F-8-BR-1/A63)
PowerFill Pooling Guide - Per-Pool Table ACTUAL= 0 EXPECTED=0 (A54-blocked)
PowerFill Cash Slotting - Map Table ACTUAL= 688 EXPECTED=688 (F-7-8 — survives BR-9 per A58)
8/8 actual matches expected. This is the strongest possible PoC evidence — the dashboards will render real data in PSX Superset's UI because the data path was validated end-to-end through Superset's own engine.
Deployed dashboard URLs
id= 13 https://bi.staging.powerseller.com/superset/dashboard/13/ PSSaaS PowerFill - Run Overview (Hub)
id= 14 https://bi.staging.powerseller.com/superset/dashboard/14/ PSSaaS PowerFill - Allocation Guide
id= 15 https://bi.staging.powerseller.com/superset/dashboard/15/ PSSaaS PowerFill - Trade Recap
id= 16 https://bi.staging.powerseller.com/superset/dashboard/16/ PSSaaS PowerFill - Pool Switching
id= 17 https://bi.staging.powerseller.com/superset/dashboard/17/ PSSaaS PowerFill - Pool Candidates
id= 18 https://bi.staging.powerseller.com/superset/dashboard/18/ PSSaaS PowerFill - Existing Pool Disposition
id= 19 https://bi.staging.powerseller.com/superset/dashboard/19/ PSSaaS PowerFill - Pooling Guide
id= 20 https://bi.staging.powerseller.com/superset/dashboard/20/ PSSaaS PowerFill - Cash Trade Slotting
Open questions and blockers
Carry-over to Workstream 2 / Phase 9
A54 (legacy proc PK bug on PS_DemoData) — STILL DEFERRED Phase 9. Per ADR-021 verbatim discipline + Option C disposition (PO-confirmed in 6c/6d/6e/7). Phase 8 W1 ships with this carry-over; the 6 user-facing dashboards render empty on the latest Failed run with the Hub dashboard's failure_step/failure_message columns explaining why. Phase 9 closes when A54 closes — Dashboards 2, 3, 4, 5, 6, 7 immediately populate.
A56 (Step 5 fail-fast cascade) — STILL OBSERVATION, doubly-blocked with A54. Phase 8 W1's Hub dashboard demonstrates the audit-trail observability path; Cash Trade Slotting dashboard demonstrates the A58-preservation observability path. Phase 9 parallel-validation harness should structure validation around these two paths.
A62 (PS_DemoData view drift) — STILL DEFERRED per Backlog #24. Phase 8 W1 mitigated via A63 defensive query (Existing Disposition dashboard reads upstream tables directly). Phase 9 closes either by deploying 002_CreatePowerFillViews.sql to PS_DemoData (now possible per A30 RESOLVED) AND reverting Dashboard 6 to query the view, OR renaming the PSSaaS view to pfillv2_*. The Phase 7 service catch-and-degrade + the Phase 8 dashboard defensive-query are independently valid; the Phase 9 closer must update both.
A64 (single-DB v1) — Phase 9+ work. Multi-tenant Superset registration (one connection per tenant DB OR Superset RBAC workspaces) is correctly deferred per kickoff §Explicit scope (OUT). The deploy script's DB_ID = 2 constant is the single per-environment configuration point; production rollouts replace it.
Architect recommendation for Workstream 2 (React UI) kickoff
The Phase 8 W1 Architect recommends:
-
W2 kickoff drafting follows the 6e/7/8-W1 specificity pattern — every spec section number cited, every prior completion-report Architect-recommendation cross-referenced. Document the new "Backlog re-read pass" as a corrective practice (per Phase 7 CR #1 + this report's CR item 1).
-
W2 should explicitly scope the framework choice as an Alternatives-First Gate decision — Vite + React + TypeScript vs Next.js vs CRA. Recommend Vite per modern JS ecosystem trends + matches docs-site nginx static-build pattern; document choice in ADR-026.
-
W2 should bank Phase 8 W1's freshness-verdict-rendering pattern — the 4 freshness verdicts (Current / Stale / TerminalEmpty / RunNotFound per A60 / ADR-025) become 4 distinct UI banner states. Phase 8 W1's
powerfill-dashboards.mddoc has the carry-over rendering vocabulary; W2 React UI uses it for the operator-workflow surface. -
W2 should be heavily subagent-delegable for component scaffolding. Each Phase 7 endpoint becomes 1 React component (8 cards/pages); the Run Submission form is bounded; the Run Status page polling logic is bounded. Architect self-implements: ADR-026, the freshness-banner UX pattern, the run-state-machine animation, the build pipeline + GHA workflow.
-
W2 PoC verification gate — at minimum: render the React UI at a staging URL; submit a run via the form; watch status transition; click a "View in Superset" deep-link from the run-status page to dashboard 13. Multi-page navigation is the smallest viable test surface.
Optional follow-up (deferred to W2 or Phase 9)
- Cross-dashboard filtering — clicking a
run_idin the Hub dashboard could drive a Jinja filter parameter for the per-report dashboards. Not needed for v1 (latest-run-wins per ADR-025); becomes meaningful when snapshot replay is added (Q3 Option C, Phase 7+). - Dashboard auto-refresh — Superset supports per-dashboard auto-refresh intervals (e.g. 30s for the Hub). Not enabled in v1; can be turned on per dashboard in Superset UI without re-deploying.
- Cash Trade Slotting JOIN to
pscat_trade_cash_grid— when a customer DB exercises Step 1 (bx_price_floor IS NOT NULL), the slot fields become populatable. Phase 9 closes by either modeling the JOIN explicitly in Phase 7 service + Phase 8 SQL, OR documenting that the slot fields are intentionally always NULL on PS_DemoData.
Recommended next steps
-
Collaborator review of:
- 8 SQL queries in
infra/superset/queries/37_*.sqlthrough44_*.sql(review focus: column accuracy; F-8-BR-1 / A63 defensive query in42_*.sql; F-7-8 / A58 preservation pattern in44_*.sql) infra/superset/deploy-powerfill.py(review focus: idempotency; chart parameter shapes; pattern fidelity vsdeploy-loan-pnl.py)docs-site/docs/superset/powerfill-dashboards.md(review focus: A54/A56/A62 carry-over rendering vocabulary; the per-dashboard UX framing)- Spec amendment to
powerfill-engine.md(Phased Implementation table) - Assumptions log A63 + A64
- This completion report
- Devlog entry
- W2 kickoff prompt Estimated 1-2 hours (Phase 8 W1 ships less new code than Phase 6e/7 — most surface is SQL + Python + docs).
- 8 SQL queries in
-
PO sign-off on:
- Phase 8 Workstream 1 (Superset Dashboards) COMPLETE declaration (sentinel
phase-8-superset-ready) - The PO milestone "I can review PowerFill reports with drill-down in Superset" — empirically achievable today. Suggested PO check: open
https://bi.staging.powerseller.com/superset/dashboard/13/(Hub), navigate to dashboard 20 (Cash Trade Slotting), confirm 688 rows render. That's the canonical end-to-end test. - A63 + A64 dispositions
- Architect recommendation that Workstream 2 (React UI) gets a fresh planning cycle in a follow-up session
- Phase 8 Workstream 1 (Superset Dashboards) COMPLETE declaration (sentinel
-
PO push of the atomic commits (Architect commits; PO controls
git push). -
Pre-push docs-build check per the Phase 6e MDX-trap lesson:
docker build -f docs-site/Dockerfile.prod docs-sitebefore pushing. -
W2 kickoff drafting — already produced as
docs-site/docs/agents/powerfill-phase-8-workstream-2-kickoff.md; review + dispatch when ready.
Notes on this session's process
- Three-layer Primary-Source Verification Gate exercised; produced 4 findings (F-8-1 through F-8-4 plus F-8-BR-1 from the Backlog re-read pass). F-8-BR-1 is the first empirical demonstration of the Phase 7 CR #1 candidate practice ("Backlog re-read pass at planning time"); banked for canonical-promotion review.
- Reviewable Chunks at workstream scope EXERCISED (W1 ships; W2 deferred per PO direction at planning checkpoint); intra-session checkpoint OFFERED but not invoked (Subagent 1 + 2 dispatched in parallel without interruption per Phase 7's "skip checkpoint" precedent that worked for 6c/6d/6e/7).
- Required Delegation Categories classification: 8 SQL queries delegated (Subagent 1; clean first-attempt on column accuracy; one F-8-3 lint caught by gate); 25-chart deploy script delegated (Subagent 2; clean first-attempt; py_compile + ReadLints zero issues); dashboard-design doc + spec amendment + 2 assumption-log entries + completion report + devlog + W2 kickoff self-implemented per Deliberate Non-Delegation. Mirrors 6e/7's split: greenfield + tests delegable; design + service + ADR + UX-load-bearing docs self-implement.
- Andon-cord readiness — used twice during the session: (a) F-8-3 outer ORDER BYs surfaced at PoC; removed in-place + each file's Notes section now documents the constraint; banked AGENTS.md citation discipline for future Superset-subagent prompts; (b) F-8-4 probe-wrapper bug for CTEs surfaced at re-probe; fixed in-place + banked CTE-detection branch logic for future probe scripts.
- Counterfactual Retro filled with 7 named observations — most important: (1) the Backlog re-read pass IS load-bearing — F-8-BR-1 is its first empirical demonstration; banking for canonical-promotion review; (2) Subagent prompts should explicitly cite known AGENTS.md lessons (F-8-3 ORDER BY would have been prevented); (3) the PO milestone IS achievable from W1 alone — empirically confirmed end-to-end through Superset's engine.
- Deploy Verification Gate all 3 arms exercised: sentinel green (
phase-8-superset-ready); 8 dashboards × 25 charts deployed + verified end-to-end through Superset's engine; 8/8 SQL queries probed clean against PS_DemoData viasqlcmd. F-7-8 / 688-row pattern is the canonical proof-of-life. - Sub-phase calendar time: ~1 Architect-session — consistent with 6a-6e and Phase 7 velocity. Banking for W2 estimate: 1-2 sessions if scoped to the kickoff's "Submit / Status / List / Reports navigation" surface.
Phase 8 Workstream 1 is code complete; the PO milestone "PowerFill reports with drill-down in Superset that I can review" is empirically achievable today; Workstream 2 (React UI) gets a fresh planning cycle in the next Architect session.
End of Phase 8 Workstream 1 completion report. Workstream 1 (Superset Dashboards) ships; Workstream 2 (React UI) deferred per Reviewable Chunks.